Gas Pipelines

gas pipelinesGas pipelines continue to be needed as new locations of gas are found.  There are about 20,000 miles of natural gas gathering lines.  Combine these with onshore and offshore lines and there are about 278,000 miles of natural gas transmission lines.  In building these important gas pipelines, correctly bending the pipeline becomes important for safety and long term maintenance.  Challenger Services provides top quality tools such as external line up clamps to build the gas pipeline right the first time.  Our external line clamp is precision bored for perfect roundness and pipe sizing.  Our open bridgework design permits full-circle welding and is ruggedly built of quality steel to last longer.